Level 1, 9/4/2024Level 1, 9/4/2024 – Can you see the new flooring!?Level 1, 8/16/2024 – Goodbye brick floorsLevel 1, 8/12/2024Level 2, 8/8/2024 – All the signs are in place nowLevel 2, 8/8/2024 – Construction area blocked offLevel 1, 8/8/2024 – Construction area block off & signs in place
BEFORE PHOTOS
As we look forward to the future updates of the 2024/2025 renovation, it’s good to remember where we have been.
First Floor Lobby from RESFirst Floor Lobby, Vending Machine AreaFirst Floor Lobby, Kitchen SpaceSecond Floor Lobby & Java LabSecond Floor Self-Service Checkout AreaSecond Floor towards Library ServicesSecond Floor towards ITSSecond Floor behind main stairsThird Floor, Stair EntranceThird Floor, stair entrance/group spaceThird Floor group study space & manipulation tablesFourth Floor Quiet Study PodsFourth Floor Quiet Study TablesFourth Floor Quiet Study Space glass wall/doors