Home » Planned Power Outage 9/8

Planned Power Outage 9/8/24

As part of the ongoing Library construction project, there will be a scheduled power shut down affecting only the 1st floor (Simulation Center & lower lobby) of the Gibson D. Lewis Library building. This will occur from Sunday, September 8th, starting at 6:00 AM and will continue until 6:00 PM.  During this time, this part of the building will be closed.   Alternative study spaces will remain available.

We apologize for any inconvenience and thank you for your patience as we work to improve our facilities.

HSC Connect: Operations & Business Management

Gibson D. Lewis Library, Level 1 stairwell under construction 9/1/2024
Level 1, 9/4/2024

Posted

in

Tags: